Bespoke Modular Switchgear Enclosure for the UK National Grid

Project In Progress

Our client for this project, a leading international infrastructure group, has secured a contract to lead the extension of a major UK substation, which will enable new sources of electricity generation (including new wind farms) to connect to the national grid.

As part of the expansion, the substation requires new distribution and control switchgear in order to accommodate the increased capacity. This critical new equipment needs to be housed in a secure, purpose-built steel enclosure, to ensure its safety, operational effectiveness, and ease of use and maintenance.

ADE Power have won the contract to design and manufacture:

  • A bespoke modular enclosure: To house the switchgear and auxiliary equipment.
  • A substructure for the enclosure: To accomodate and protect the switchgear cables leading into and out from the enclosure.
  • Platforms and stairs: To allow personnel access to and from the enclosure.
ADE Power Spider Logo

3D Design

Complete
ADE Power Spider Logo

Fabrication

In Progress

The main element of this project, the bespoke modular enclosure that will house the distribution and control switchgear, consists of 2 modules. The reason for splitting the enclosure into 2 modules is for ease of manufacture, fit-out, transport to site, and installation. The modules will be linked together on site by our client's engineers when they're installed on top of the substructure.

Fabrication of the steel enclosure modules is now nearing completion in the factory, with paint preparation work already underway.