News & Case Studies
View all the latest company and industry news, and project case studies from ADE Power.
Showing 43 - 48 of 61
More Gas Enclosures
This Bespoke-Manufactured Acoustic Enclosure was 1 of 4 dispatched from an order of 10 that were each fitted out with a 1000 kW emergency standby gas generator.
Read More Gas EnclosuresShopping Centre Backup
This 220 kVA Cummins Silent Diesel Generator complete with Bund Tray & 400A ATS was supplied to a shopping centre in Sheffield to supply emergency backup power.
Read Shopping Centre BackupModular Data Centre
This Bespoke 2-Section Data Centre Housing containing a data hall & other equipment was installed at a high-profile UK research & manufacturing facility.
Read Modular Data CentreAfrican Data Centre
This Bespoke Acoustic Enclosure housing a 2250 kVA Cummins Diesel Generator was shipped to a data centre in Egypt where it joined 2 previous backup power units.
Read African Data CentreUniversity Backup
This 330 kVA Cummins Silent Diesel Generator bespoke-fitted with several modifications was installed in a plant room to provide backup power to a UK University.
Read University BackupTriple Telecoms
Another 3 Bespoke Telecoms Diesel Generators were delivered to different sites in Northern Ireland to provide essential backup power to telephone exchanges.
Read Triple TelecomsFor more information about our full range of Power Solutions
Get in touch to speak with our experts