News & Case Studies

View all the latest company and industry news, and project case studies from ADE Power.

Showing 43 - 48 of 61

More Gas Enclosures

This Bespoke-Manufactured Acoustic Enclosure was 1 of 4 dispatched from an order of 10 that were each fitted out with a 1000 kW emergency standby gas generator.

Read More Gas Enclosures 

Shopping Centre Backup

This 220 kVA Cummins Silent Diesel Generator complete with Bund Tray & 400A ATS was supplied to a shopping centre in Sheffield to supply emergency backup power.

Read Shopping Centre Backup 

Modular Data Centre

This Bespoke 2-Section Data Centre Housing containing a data hall & other equipment was installed at a high-profile UK research & manufacturing facility.

Read Modular Data Centre 

African Data Centre

This Bespoke Acoustic Enclosure housing a 2250 kVA Cummins Diesel Generator was shipped to a data centre in Egypt where it joined 2 previous backup power units.

Read African Data Centre 

University Backup

This 330 kVA Cummins Silent Diesel Generator bespoke-fitted with several modifications was installed in a plant room to provide backup power to a UK University.

Read University Backup 

Triple Telecoms

Another 3 Bespoke Telecoms Diesel Generators were delivered to different sites in Northern Ireland to provide essential backup power to telephone exchanges.

Read Triple Telecoms 
1 2 3 4 5 6 7 8 9 10 11

For more information about our full range of Power Solutions

Get in touch to speak with our experts